American Express Centurion Lounge

Construction of the core and shell, as well as the interior buildout of the American Express Centurion Lounge on Concourse E at Hartsfield-Jackson Atlanta International Airport. This is the largest Centurion Lounge in the world and serves as American Express’ flagship lounge spanning approximately 26,000 square feet. The structure sits atop the existing roof and features two outdoor terraces with views of the tarmac and a live planter wall along the entrance. Additionally, it includes a VIP bourbon bar, shower suites, private workspaces, and a full kitchen serving food throughout the day.

 

4417-02.jpg
4417-04.jpg
4417-05.jpg
4417-03.jpg

Delta Sky Club Expansion

Expansion and renovation of existing Delta Sky Club that New South originally built and opened in 2016. The project will include doubling the square footage of the existing club and a full renovation to the existing club. An interesting element of this project is that it is completely freestanding of the existing concourse and rests on 4 cruciform columns and constructed above the existing concourse.

Screenshot 2023-01-05 102140.png

Domestic Main Security Checkpoint Standardization & Optimization

Renovation of Main Security Checkpoint at H-HAIA to include installation of new CPSS Security Lanes and other security screening equipment to match the recently completed South Security Checkpoint. Buildout also includes a new TSA breakroom and CCTV systems.

 

NewSouthConstruction_H-JAIA_013.JPG
NewSouthConstruction_H-JAIA_001.JPG
NewSouthConstruction_H-JAIA_015_c.jpg

H-JAIA CMAR On-Call Program  

New South – Synergy, A Joint Venture has been selected as one of the contractors on the RFP-C-1220259, On-Call Construction Management at Risk (CMAR) Services at H-JAIA.  Our team will publish opportunities as they arise. 

Concourse C Gate Conversion - 50,000 SF of modifications to ground support and gates.

Lower North Checkpoint - Installation of new ceiling and LED lights along the lower north corridor at Hartsfield-Jackson Atlanta International Airport. Scope also included the installation of a new security lane, a storefront system for employee checkpoints as well as a new LEO podium and breakroom for TSA. 

F1 PBB - Replacement of the F1 passenger boarding bridge with existing F3A PBB. Retrofitting of F3A PBB components to match conditions of F1. 

North Ticketing Enabling - Demolition and remodeling of abandoned H-JAIA offices to be used by North Ticketing officials.

OneStop Pilot Program - Addition of new spaces within existing E14 and F10 hold rooms for Delta.

ADG V Gate Conversions - Scope involves reconfiguring several gates at Concourse E and F to meet the requirements of Airplane Design Group V (ADG V).

Blue Skies: 100 Years of the Atlanta Airport Exhibit - 100 Years of the Atlanta Airport exhibit highlights the airport's evolution from its first commercial flight in 1926 to its role as the world's busiest and most efficient airport. The installation is along the passenger corridor of the plane train level between Concourses D and E.

ATLAS - A 14-foot glowing digital sphere display located in the heart of the Domestic Terminal Atrium. 

4309-19.jpg
NSC_HIstoryofATL_HJAIA_2026_000.jpg
NSC_HJAIA_2026_002.JPG

H-JAIA Aviation Administration Center Under Construction 

V01.jpg

New South-Synergy, A Joint Venture is excited to announce that we are working with Hartsfield-Jackson Atlanta International Airport on the new Aviation Administration Center. This office building will serve as the main campus for airport management and operations staff. The 200,000-square-foot office building will include pedestrian walkway bridges, a parking deck and associated site improvements. 

The project is slated for completion in 2026. 

 

 

MARTA Station Rehabilitation Program  

The Station Rehabilitation Program is a multi-year program involving all MARTA stations.  MARTA has contracted with four different firms to provide Construction Manager At Risk (CMAR) services to manage and deliver these projects.  Each station is different in size, scope, and complexity.  The work involves various aspects of architectural, mechanical, and electrical upgrades.  New South – Synergy has currently been awarded the stations listed below with the scope described below.

 

Work is active across the following stations: 

 

  • Airport Station

  • Lenox Station

  • West End Station 

  • Peachtree Center Station

  • Brookhaven Station 

  • Chamblee Station 

  • Doraville Station 

  • SEC Station

  • South Yards Facility  

MARTA_edited.jpg

Summerhill Apartments 

New South-Synergy constructed Carter & Associates' Summerhill Apartments branded, 565 Hank. The new, 312,426-square-foot, 306-unit multifamily development is located on the old 83-acre Turner Field site. The multifamily community, includes 8,575-square-feet of ground-level retail space, and was part of Phase I of the private development team's plan to overhaul 35-acres into the up-and-coming Summerhill neighborhood, which includes corporate offices, traditional multifamily units, student housing and retail. The ground-level retail space lines Hank Aaron Drive and features a mix of restaurants and service providers. 

The five-story development  includes a mix of one-, two-, and three-bedroom apartments as well as six live-work units. Of the one- and two-bedroom units available, 31are set aside for those earning 80 percent of the area's median income. Community amenities include a resort-style pool, multiple seating areas, grilling stations, a fire pit, dog park and pet grooming station. Additionally, the community features a two-story club room with a fireplace, kitchen and meeting space as well as a fitness center with yoga and spin rooms, weight machines, and cardio equipment. 

The Hank 5 .jpg
The Hank 1.jpg
451.jpg

Concourse T-North Extension at HJAIA 

The Concourse T North Extension provides five new gates to the north end of Concourse T at Hartsfield-Jackson Atlanta International Airport. Prior to extending T Concourse, the team completed an extensive enabling package that included re-routing North Terminal Parkway through the North Economy Parking lots, and re-routing the main Georgia Power ductbank and fiber communication network to align with the new roadways. Additionally, the North entry and exit toll plazas were upgraded and rebuilt along with creating a new Transportation Network Company drop-off and pickup area within the newly designed parking lots. The new extension displaced Delta’s Ground Support Equipment building and Fire Station 32, where sitework for the Delta GSE and reconstruction of Fire Station 32 were also provided under this contract. Other major sitework included relocation of 24” and 30” City of Atlanta water mains and installation of 20” concrete apron paving to service the new gates.

This project was completed as a quad-venture by SNFS.

New South-Synergy is part of the SNFS Joint Venture team. 

4351-05.jpg
4351-21.jpg

Central Passenger Terminal Complex,

Landside Modernization at HJAIA

New South and Synergy were part of the Joint Venture team, NSMS, who completed the Central Passenger Terminal Complex's Landside Modernization (LMOD) at HJAIA. The purpose of this project was to renovate, upgrade, and modernize the exterior and interior of the public-facing domestic facilities.

 

The LMOD project involved updating the domestic terminals by constructing two massive structural steel canopies and completely transforming the building’s facades. The canopies, which span the north and south terminal roadways, measure 864’ long x 200’ wide and are covered by inflatable ETFE fabric pillows. Each HSS structure, ranging from 14”-20” diameter, consists of 19 “supertrusses” which are connected by a total of 198 x-shaped diagrid members. The structures are covered by semi-transparent ETFE pillows that are constantly inflated by blowers on the roof of the terminal. In addition to the new canopies, construction of the new facades included the complete demolition of the existing entryways and the construction of a new curtain wall, sliding doors, and metal paneled “mini-canopies” at each entrance. Additionally, the full exterior façade of the terminal was re-skinned with metal panels, new storefront clerestories, and glass panels.

 

New South-Synergy is part of the NSMS Joint Venture team. 

South Security Checkpoint Expansion at HJAIA

The most utilized security screening checkpoint at the world's most traveled airport was recently expanded by New South-Synergy, A Joint Venture. 

In addition to increasing the number of security lanes available, the project installed eight new CT scanners which are a first for airport security screening. This new technology is still in its trial phase and with that cam numerous construction challenges for the project team. In addition to working in an active airport, the project team had to contract, coordinate, and install technology that is still in development and never before used at an airport facility. 

Evolving equipment and project requirements, local and federal agency approvals, international travel restrictions during the height of COVID-19, TSA authorizations, unforeseen conditions, and more had to be overcome to deliver this project ahead of schedule and under budget. All of which occurred while maintaining the passenger experience and without impact to operations or security screening. 

A380, Gate F3 Reconfiguration at HJAIA

This reconfiguration allows for an A380 aircraft (Group 6) to be accommodated on the new Concourse F. At the time of construction, no gate on Concourse F could accommodate the A380, and it was the desire of the Department of Aviation (DOA) to have the ability to have a Group 6 aircraft gated on Concourse F. Gate F3 was chosen as the best location; however, both the terminal and air-side areas required improvements. The air-side improvements to Gate F3 included an addition of a second loading bridge and relocation of the aircraft lead-in line.

Concourse improvements included a new vertical transportation core and tie-in to the CBP sterile corridor, additional millwork for the new bridge, and extension of the concourse level sterile corridor to tie-in to the new vertical transportation core. The vertical transportation core included a stairway, elevator, and an escalator.

Topped Out Steel (4.28.17).jpg
Jet bridge and structure D.JPG
Final Finishes - Escalator & Stairs (12.

Palmetto Library 

The 13,000-square-foot branch library for Fulton County was constructed with a steel frame on concrete foundations. The exterior walls received cement-fiber composite board siding, and the roof was constructed with metal roof panels and TPO. The majority of the library interior work was architectural casework and millwork due to the excess amount of shelving, cabinets, openings, and seating. More than half of the total square footage of the flooring is access panel flooring with underfloor HVAC and electrical distribution.

This project is LEED Silver certified.

Palmetto Library Dedication (8).JPG
Palmetto Library Dedication (11).JPG
Palmetto Library Dedication (14).JPG
Palmetto Library Dedication (23).JPG